Please refer to the diagram above or see specification
Installation
Valve D must be connected to the flow line, or circulating pump discharge line.
Valve C must be connected to the return line, or circulating pump suction line.
Valve E is connected to drainage.
Dosing Procedure
Close isolating Valves C & D.
Open the dosing pot fill Valve A, air-venting Valve B, & drain Valve E, to empty pot.
Close drain Valve E, and fill the dosing pot with the appropriate product through the funnel.
Close valves A & B to seal pot.
Open isolation Valves C & D to allow circulation through the pot into the system to be treated. Allow sufficient time for chemical treatment to be mixed into the main system.
Close Valves C & D to isolate the pot from the main system.
Alternative Products
These other products might interest you
Accessories Products
To install this Web App in your iPhone/iPad press
and then Add to Home Screen.